Second Step for Licensing a Pharmaceutical Factory, at this Step, a final visit and inspection of the pharmaceutical factory to be licensed is carried out by Pharmacy and Drug Control Department inspection team
Requirements and Documents: - Request to obtain the license before the end of the initial approval.
- Fill out the final assessment form for a pharmaceutical factory (step 1.B).
- A copy of the initial approval.
- The factory management completes the infrastructure, buildings, and all technical matters.
- Appointing the main human cadres in the factory (factory technical director, production manager, quality control manager).
- Providing an organizational structure for the factory that shows the different departments and the number of employees in them.
- A picture of the facility’s exterior signboard.
- A copy of the commercial register and commercial license.
- A copy of the civil defense certificate.
- Approval from the Security Systems Department to regulate the use of security cameras and surveillance devices.
- The names of persons authorized to sign official correspondence.
- Electricity and water number.
- A copy of the medical waste company’s contract.
- Telephone number for contact.
All documents to be sent by email to:
inspection&narcotic@moph.gov.qa
After receiving and reviewing the documents requester obtains:
The factory to be licensed is inspected by a team from different departments. The inspection is based on the principles of good manufacturing practices, and then a report is written and sent to the factory to be licensed. If the factory conforms to good manufacturing practices, it is given a pharmaceutical manufacturing license (ML) specifying the production lines. that were inspected.
Time taken to complete the service:
Please click the E-Service button below to download the application form.